Introduction

Leading the Mobility of the Future

Connecting Communities, Culture and Business

Video: mrl.com.my
Travellers' Guide · Updated October 2026

ECRL Terengganu The First Railway In the State's History

After decades of relying solely on roads, Terengganu is finally getting 6 railway stations. Gombak to Kuala Terengganu takes just 2 hours 54 minutes on the Express, with fares from RM95. This is the complete guide — ticket prices, travel schedules, which station for which destination, what has been confirmed and what has not.

—Days
—Hours
—Minutes
—Seconds

Countdown to 12 December 2026 — the start date of commercial operations for Gombak – Kota Bharu, announced by the Minister of Transport (20 October 2026). A 30% discount on Economy Class throughout the first month.

Tren EMU ECRL 6 gerabak
6Stations in Terengganu (out of 16 passenger stations)
242 kmBesut – Kemaman alignment
2h 54mGombak → Kuala Terengganu (Express)
160 km/hMaximum speed
409–425Passengers per 6-car EMU set
98.16%Overall physical progress (Sept 2026)
ECRL Project

The ECRL Project: East Coast Rail Link

The East Coast Rail Link (ECRL) is not just a railway project — it is among the largest infrastructure investments in the nation's history. Developed by the Government of Malaysia in cooperation with the Government of the People's Republic of China under the Belt and Road Initiative (BRI), the ECRL connects the East Coast directly to the economic heart of the West Coast.

Behind this project: Malaysia Rail Link Sdn Bhd (MRL), a company wholly owned by the Minister of Finance (Incorporated) as the asset owner, and China Communications Construction Company Ltd (CCCC) as the engineering, procurement, construction and commissioning (EPCC) contractor.

More than just a 665 km line, the ECRL is a key component of the nation's sustainability strategy under the SDG Sukuk Framework — proof of Malaysia's commitment to building a sustainable future, from coast to coast.

Kemajuan tapak ECRL setakat Ogos 2026 — video Malaysia Rail Link

Video: ECRL Site Progress as of August 2026 · Malaysia Rail Link

Main ECRL Station Designs

Reka bentuk Terminal Bersepadu GombakGombak Integrated Terminal
Reka bentuk Stesen Kota BharuKota Bharu
Reka bentuk Stesen KotaSASKotaSAS
Reka bentuk Stesen Kuala TerengganuKuala Terengganu

Station facilities — ticket counters, waiting areas, retail spaces and parking — see the section Station & Onboard Facilities.

ECRL route & station map

Infografik laluan ECRL dari Kota Bharu ke Gombak

Images & videos: mrl.com.my · ecrl.com.my · Infographic: Discovery Terengganu

Interactive Map

The ECRL Route in Terengganu

Click any station to see its actual location and nearby destinations. Switch to Entire Route to see all 20 stations from Kota Bharu to Port Klang.

Express Stop Transit ECRL alignment Interchange station Passengers & cargo Phase 2 (2028)
TO KOTA BHARU TO KUANTAN / GOMBAK

Terengganu map: station positions based on announced site locations · Entire Route: schematic diagram (not to scale) based on the official EOSB banner · distances are approximate road distances. Confirm on Google Maps before setting off.

Quick Planner

Where are you heading? This is the ECRL station you should get off at

Choose a destination — we show the nearest station, distance, driving time and the type of train that stops there.

Six Gateways

Terengganu's ECRL stations — and where they are actually located

This is the part most people get wrong. A station's name is not necessarily the same as its location. We list the actual locations so you can plan onward transport from the start.

Jerteh Station

Besut District
Transit
From GombakRM114Transit
Located in Kg Alur Keladi, approximately 8.7 km (~13 minutes) from Jerteh town.
  • Kuala Besut Jetty → Perhentian Islands~25 km · 30 min
  • Jerteh Town~8.7 km · 13 min
  • Kelantan Border~20 km
The nearest gateway to the Perhentian Islands.

Bandar Permaisuri Station

Setiu District
Transit
From GombakRM107Transit
Located in Kg Buloh — the closest to town of all the Terengganu stations, just ~1.2 km (~2 minutes) from Bandar Permaisuri.
The best choice for Merang, Bidong and Setiu Wetlands.

Kuala Terengganu Station

Marang District
Express
From GombakRM95TransitRM110Express
Despite its name, this station is actually in Kg Durian Guling, Marang district — approximately 23 km (~27 minutes) from KT town centre.
The only express stop in Terengganu & a city-level TOD hub (T2).

Dungun Station

Dungun District
Transit
From GombakRM82Transit
In Batu 7 Industrial Area — approximately 6.7 km (~10 minutes) from Kuala Dungun. A passenger station and cargo.
  • Rantau Abang (turtle coast)~14.5 km · 16 min
  • Kuala Dungun & Teluk Lipat Beach~6.7 km · 10 min
  • Bukit Bauk Eco Park~3 km
Gateway to educational institutions & the Rantau Abang coast.

Kemasik Station

Kemaman District
Transit
From GombakRM75Transit
Named Kemasik, but its physical location is in Kg Chabang, next to Kerteh — ~5.6 km from Kerteh town, ~8–9.5 km from Kemasik Beach.
  • Kemasik Beach~8–9.5 km · 12 min
  • Kerteh Town~5.6 km · 6 min
  • Kerteh Airport~4 km
Supports gas & petroleum industry activities.

Chukai Station

Kemaman District
Transit
From GombakRM69Transit
Near Taman Samudera Timur — approximately 8.2 km (~13 minutes) from Chukai town. A passenger station and cargo.
Terengganu's southern gateway, at the end of the state's alignment.
Understand This Before Buying Tickets

ECRL services: Express and Transit are not the same thing

The ECRL will offer two types of passenger service. The difference is big, especially if you want to get off at Jerteh, Dungun or Chukai.

Express Stops at main stations only: Gombak → KotaSAS → Kuala Terengganu → Kota Bharu. The fastest, with the fewest stops.
Transit Stops at all stations, including Jerteh, Bandar Permaisuri, Dungun, Kemasik and Chukai. A longer journey but full coverage.
Separate cargo Cargo trains and passenger trains are different trains — they are not combined in the same service.

Official ECRL schedule: 12 trips a day (Monday–Thursday) and 16 trips a day (Friday–Sunday), split equally in each direction. The exact departure times for each train have not yet been published.

Official EOSB Figures · October 2026

How many hours by ECRL to KL? Actual journey times

Official journey times for the Express service (stopping at the 4 main stations only) and Transit (stopping at all stations), according to ECRL Operation Sdn Bhd.

Infografik rasmi masa perjalanan ECRL

ecrl.com.my infographic — Express service times. The schedule figures below are from the official EOSB slides (October 2026).

RouteExpressTransitRoad
Gombak ↔ Kuala Terengganu2 hrs 54 min3 hrs 51 min6–7 hrs
Gombak ↔ Kota Bharu4 hoursup to 5 hrs~7 hrs
Gombak ↔ KotaSAS (Kuantan)1 hr 27 min2 hrs 5 min~3 hrs

Coming from the Klang Valley? Here are your connections

Phase 1 · Dec 2026Gombak Integrated Terminal (TBG)The southern end of Phase 1 and an Express stop. Near Gombak LRT Station — the end of the LRT Kelana Jaya Line which runs through KL Sentral, Masjid Jamek and KLCC.
Phase 1 · Dec 2026TemerlohInterchange station with the existing KTMB line in Pahang.
Phase 2 · 2028Bandar SerendahInterchange station with the existing KTMB line, near Taman Desa Kiambang.
Phase 2 · 2028Jalan Kastam (Port Klang)Integration with the existing KTMB station, as well as rail links to Northport & Westports.

According to EOSB, the ECRL connects with KTM ETS / Intercity, KTM Komuter and the LRT Kelana Jaya Line. Details of pedestrian links between stations have yet to be announced.

Latest Info from EOSB

ECRL Classes: Business Class, Premium Economy & Economy

ECRL passenger trains offer three classes. Click each class to see its facilities and number of seats.

Kabin Kelas Perniagaan ECRL dengan kerusi 2+2 berwarna tealActual photo · EOSB

Business Class

52seats
  • Premium travel experience
  • Access to lounge Business Class
  • Priority lane at the departure gate
  • Complimentary meals and drinks
Seat distribution per trainsetTotal of 409 seats
Business 12.7%Premium Economy 23.2%Economy 64.1%

Source: official ECRL Operation Sdn Bhd (EOSB) slides — “Set 1” (Business Class + Premium Economy & Economy). A 6-car EMU set that is entirely economy class carries 425 passengers. Seating configuration: 2+2 (Business) and 3+2 (Premium Economy & Economy). Economy Class fares have been announced — see below; Business & Premium Economy fares have not.

Actual Photos · EOSB

Facilities on ECRL trains & at stations

Not renders — these are actual photos of ECRL trains and stations shared by ECRL Operation Sdn Bhd (EOSB) during an official tour in October 2026.

On the train

Bilik solat dalam tren ECRL dengan panel kerawang berbentuk mihrab
Prayer roomA quiet, dedicated space to perform prayers during the journey — no need to wait until you reach a station.
Sinki wuduk bersebelahan bilik solat dalam tren ECRL
Ablution areaAblution sinks are provided right next to the prayer room.
Kaunter bistro dalam tren ECRL dengan lampu biru
BistroFood and drinks can be purchased throughout the journey. Economy Class also has access to the bistro.
Tandas mesra OKU dalam tren ECRL dengan pemegang sokongan kuning
Disabled-FriendlyAccessible OKU toilets with support rails and more space, as well as dedicated OKU seats.
Overhead racks & adjustable seatsOverhead storage racks above every seat. Seats can be rotated to face the direction of travel.
4G, 5G Internet & Wi-Fi4G and 5G internet coverage along the entire route, plus Wi-Fi access for passengers. You can work or stream along the way.

At the station

Kaunter tiket di dalam stesen ECRL
Ticket counterBuy tickets and get travel assistance directly at the counter.
Ruang menunggu penumpang yang luas di stesen ECRL
Waiting areaSpacious waiting areas before departure, as well as retail space for food and travel essentials.
Ruang parkir terbuka di hadapan Terminal Bersepadu Gombak ECRL
Parking areaAmple parking at the station — the photo shows Terminal Bersepadu Gombak. Parking rates have yet to be announced.
Krew ECRL berpakaian seragam bermotif songket di dalam kabin tren
Frontline Crew A warm welcome starting from the platform

EOSB crew assist you from the platform right to your seat — including help boarding the train and on-board service.

Official Ticket Prices · ECRL Ticket & Fare

ECRL ticket prices: Gombak to Kuala Terengganu from RM95

One-way Economy Class fares, as presented by ECRL Operation Sdn Bhd (EOSB). Prices are shown as “from as low as” because ECRL uses a dynamic fare mechanism.

30%discount
Launch promotion: 30% discount on Economy Class for the first month Starting from the first day of operations 12 December 2026. For example, Gombak → Kuala Terengganu Transit RM95 becomes ~RM66.50, Jerteh RM114 → ~RM79.80, Chukai RM69 → ~RM48.30. For members of the public without concession fares — cannot be combined with the 50% / 40% discounts. Source: Transport Minister Anthony Loke, 20 October 2026.
Terengganu Route
Gombak ↔ Kuala Terengganu378 km
TransitRM95
ExpressRM110

One-way · from as low as

First month: ~RM66.50 / ~RM77 (30% discount)

Gombak ↔ Kota Bharu523 km
TransitRM125
ExpressRM147

One-way · from as low as

Gombak ↔ KotaSAS (Kuantan)209 km
TransitRM60
ExpressRM68

One-way · from as low as

Transit fares from Gombak to each stationEconomy Class · one-way · from as low as · official EOSB slides

Terengganu

  • Jerteh473 kmRM114
  • Bandar Permaisuri436 kmRM107
  • Kuala Terengganu Express RM110378 kmRM95
  • Dungun317 kmRM82
  • Kemasik285 kmRM75
  • Chukai256 kmRM69

Kelantan

  • Kota Bharu Express RM147523 kmRM125
  • Pasir Puteh490 kmRM118

Pahang

  • Cherating246 kmRM67
  • Kuantan Port City222 kmRM62
  • KotaSAS Express RM68209 kmRM60
  • Paya Besar186 kmRM55
  • Maran127 kmRM42
  • Temerloh91 kmRM35
  • Bentong40 kmRM24
  • Transit stops at every station; Express stops at Gombak, KotaSAS, Kuala Terengganu and Kota Bharu only.
  • The same rates apply for return journeys.
  • Dynamic fares — the actual price at the time of booking may be higher than the “from as low as” price. Book early for the best chance of the lowest fare.
  • Fares between stations (e.g. Kuala Terengganu → Kota Bharu), Express fares other than the 3 routes above, as well as Business Class & Premium Economy have yet to be announced.
50%Economy Class discount
  • Children aged 2–12
  • Senior citizens — Malaysian citizens aged 60 and above
  • OKU (Disabled) — all OKU card holders
  • Government pensioners — former civil servants
40%Economy Class discount
  • Students aged 13–24

Example: Gombak – Kuala Terengganu Transit ticket RM95 → ~RM47.50 for children, ~RM57 for students. Subject to terms and conditions.

Buy ECRL tickets online: official sales open mid-November 2026 Three official purchase channels:
ECRL AppDownload from the app store
Ticket counterAt ECRL stations

Source: official ECRL Operation Sdn Bhd (EOSB) slides, ECRL Entrepreneur & Support Services Contractor Roadshow, October 2026. Confirm the latest prices at ecrl.com.my before booking. This page is not an official ECRL website.

Construction Status

How far along is the ECRL project?

Progress as of the latest statements from MRL (18 September 2026), EOSB (October 2026), the Transport Minister and state exco members.

98.16%Overall physical progress as of September 2026, across Kelantan, Terengganu, Pahang and Selangor
99.54%Progress of the Terengganu alignment only, as of September 2026
409–425Passengers per 6-car EMU set — 425 if all economy class, 409 with a business class cabin
2.2 millionSeats available throughout 2027 in the initial phase — 10 EMU trainsets, 12–16 trips a day
Timeline

ECRL timeline: what has happened and what is coming next

  • January 2026
    First passenger trainset arrives in KuantanCompletedTrains built by CRRC Dalian, with speeds of up to 160 km/h.
  • February 2026
    Project reaches 91.7%, enters operational readiness phaseCompletedA train arrival ceremony was held at ECRL KotaSAS Station.
  • June – July 2026
    Terengganu alignment reaches 99.45%CompletedAmong the highest, after Kelantan.
  • August 2026
    Power energisation completed, System Integration Testing (SIT) beginsCompletedElectricity supplied to 10 power supply stations.
  • September 2026
    Overall physical progress reaches 98.16%CompletedAcross Kelantan, Terengganu, Pahang and Selangor. Site Acceptance Testing (SAT) completed and System Integration Testing continues.
  • 23 October 2026
    Fault-Free Run (FFR) beginsComing SoonVerifying train and system reliability against technical requirements — 8,000 km of failure-free running for each set, supervised by APAD.
  • Early November 2026
    Trial runs (trial operations)Coming SoonFocus on timetable management, stations and staff safety procedures.
  • Mid-November 2026
    Official ticket sales openComing SoonVia the ECRL App, the ecrl.com.my website and station ticket counters.
  • 12 December 2026
    Commercial operations beginTargetGombak – Kota Bharu passenger and freight services with 10 EMU trainsets, at speeds of up to 160 km/h. 30% Economy Class launch discount for the first month (Transport Minister, 20 October 2026).
  • January 2028
    Phase 2: Gombak – Port KlangExtension to the west coast and the Port Klang logistics hub.
Straight Talk

Before you plan a holiday on the ECRL: what you need to know

Ticket prices are out, but we don't want to sell you a dream. These are the real issues still open as of October 2026.

No last-mile connections yet So far, no feeder bus network, shuttle, operator or fare has been announced for any ECRL station in Terengganu. Plan on e-hailing, taxis or car rental from the station.
Stations far from town Except for Bandar Permaisuri, most stations are 6–23 km from their respective town centres. Kuala Terengganu Station is the most notable — ~23 km from the city centre.
Departure times not yet released Frequency has been announced (12 trips a day Monday–Thursday, 16 a day Friday–Sunday), but first and last train times have not. Wait for the full timetable before committing to connecting flights or packages.
TOD still at an early stage The state government signed an MoU with MRL in November 2025 for TOD development. Phase 1 at six stations is estimated to require RM228 million, including transit terminals. Timeframe of 1–3 years.
FAQ

ECRL Terengganu FAQ — the questions people ask most

Gombak – Kota Bharu commercial operations begin on 12 December 2026, as announced by Transport Minister Anthony Loke on 20 October 2026 — earlier than the original target of January 2027. Before that, the Fault-Free Run began on 23 October, trial operations in early November and ticket sales opened in mid-November 2026. To mark the launch, Economy Class tickets are discounted by 30% for the first month.

One-way Economy Class (Transit) fares from Gombak start from as low as: Jerteh RM114, Bandar Permaisuri RM107, Kuala Terengganu RM95, Dungun RM82, Kemasik RM75 and Chukai RM69. To Kota Bharu RM125 and KotaSAS RM60. For Express: Kuala Terengganu RM110, Kota Bharu RM147, KotaSAS RM68. The same rates apply for return journeys; ECRL uses dynamic fares, so actual prices may be higher. Source: official EOSB slides, October 2026.

From Gombak to Kota Bharu, one-way Economy Class fares start from RM125 (Transit) or RM147 (Express), with a journey time of 4 hours by Express or up to 5 hours by Transit. To Kuantan, the Express stop is KotaSAS: RM60 (Transit) or RM68 (Express), 1 hour 27 minutes by Express. Kuantan Port City Station is RM62 (Transit only). These prices are “from as low as” because of dynamic fares.

Not officially announced yet. Official EOSB slides as of October 2026 only list fares from Gombak to each station. The “estimated fares from all stations” table going viral on social media is a calculation by members of the public (the difference in fares from Gombak), not official rates. Confirm at www.ecrl.com.my when ticket sales open in mid-November 2026.

Official ticket sales open mid-November 2026 through three channels: ECRL App, the website www.ecrl.com.my and ticket counters at ECRL stations. Dynamic fares — book early for the best chance of the lowest price.

Yes, for Economy Class. Launch promotion: 30% discount for the first month of operations starting 12 December 2026, for members of the public without concession fares (cannot be combined with other discounts). Permanent concession discounts: 50% for children (aged 2–12), Malaysian senior citizens (aged 60 and above), OKU card holders and government pensioners; 40% for students aged 13–24. Subject to terms and conditions.

Departure times for each train (full timetable) have not been published as of October 2026 — check the ECRL App or www.ecrl.com.my when ticket sales open in mid-November. What has been confirmed: 12 trips a day from Monday to Thursday (6 in each direction) and 16 trips a day from Friday to Sunday (8 in each direction). Around 2.2 million seats are available throughout 2027.

From Kuala Terengganu Station (Kg Durian Guling, Marang) to Terminal Bersepadu Gombak: 2 hours 54 minutes by Express or 3 hours 51 minutes by Transit, compared with 6–7 hours by car. From Gombak, connect LRT Kelana Jaya Line to KLCC, Masjid Jamek or KL Sentral. The drive from Kuala Terengganu town to the station (~27 minutes) is not included.

Yes. ECRL trains are equipped with a prayer room with ablution area next to it, a bistro, OKU-friendly toilets, dedicated OKU seats, as well as 4G, 5G internet and Wi-Fi along the entire route.

There are two jetty options. Via Shahbandar Jetty Kuala Terengganu — ~23 km (26 minutes) from ECRL Kuala Terengganu Station. Or via Merang Jetty — ~35 km (34 minutes) from Bandar Permaisuri Station. Choose according to your resort package.

Jerteh Station (Kg Alur Keladi) in the Besut district. From there, Kuala Besut Jetty is about 25 km away (~30 minutes). Note that Jerteh is a transit-only station — express trains do not stop there.

Yes. After the realignment, the station was moved to Kg Durian Guling, Marang district, about 23 km or a 27-minute drive from Kuala Terengganu city centre. It remains the only express stop in the state.

None has been announced yet. The RM228 million TOD Phase 1 allocation covers the development of transit terminals at six stations, but no routes, operators or start dates have been confirmed so far.

No passenger vehicle transport service has been announced. ECRL freight trains operate separately from passenger trains and are not advertised as an auto-train.

Three classes: Business Class (52 seats, 2+2 configuration), Premium Economy Class (95) and Economy Class (262), both 3+2 — a total of 409 seats for a trainset with a business class cabin, according to EOSB. Economy Class fares start from RM95; Business and Premium Economy fares have yet to be announced.

Not announced yet. As of October 2026, ECRL has only announced Economy Class fares (Gombak – Kuala Terengganu from RM95). Business Class has 52 seats in a 2+2 layout, access to the lounge, a priority lane at the departure gate and complimentary meals and drinks. Prices will be updated at www.ecrl.com.my.

ECRL assets are owned by Malaysia Rail Link Sdn Bhd (MRL), a company wholly owned by the Minister of Finance (Incorporated). Day-to-day operations will be handled by ECRL Operation Sdn Bhd (EOSB), which is currently recruiting its pioneer team. The construction contractor is China Communications Construction Company (CCCC).

Passenger trains reach a maximum speed of 160 km/h. Freight trains run at 80 km/h. The ECRL is not high-speed rail — it is a conventional higher-speed intercity railway.

Discovery Terengganu

Plan your Terengganu holiday now

Islands, waterfalls, heritage and food — all within a one-hour radius of the station. Explore Terengganu destinations and tour packages with us.

Explore Terengganu Destinations
Updated: 20 October 2026

Reference sources

  • ECRL Operation Sdn Bhd (EOSB) — “ECRL Anatomy” banner, 20-station map & “Seating Class Options” slide, ECRL Entrepreneur and Support Services Contractor Roadshow, Terengganu (recorded by the Discovery Terengganu team)
  • EOSB — slide of Economy Class Transit fares from Gombak to 15 stations (October 2026)
  • The Edge Malaysia (20 October 2026) — Transport Minister Anthony Loke: operations begin 12 December 2026, 30% Economy Class discount for the first month
  • Official ECRL infographic — overall physical progress of 98.16% as of September 2026 across Kelantan, Terengganu, Pahang and Selangor
  • Bernama (18 September 2026) — MRL statement: 95.41% overall & 97.65% Phase 1 progress, FFR in October, operations as early as mid-December 2026
  • ECRL Operation Sdn Bhd (EOSB) — ECRL Entrepreneur & Support Services Contractor Roadshow slides (October 2026): Economy Class fares, discounts, journey times, frequency, launch timeline, station & on-board facilities, ticket purchase channels
  • New Straits Times (10 February 2026) — 6-car EMU: 425 passengers (full economy) or 409 (with a business class cabin)
  • Statement by Transport Minister Anthony Loke (14 August 2026) — 10 trainsets, daily capacity
  • National Security Council (MKN) — Summary of ECRL Passenger Rail Information for Terengganu
  • Terengganu State Government Exco — state alignment progress & express/transit services, July 2026
  • Terengganu State Assembly (DUN) — RM228 million TOD Phase 1 allocation for six stations
  • Terengganu State Government – MRL MoU on TOD development, November 2025
  • Official MRL & ECRL website — 665 km alignment, 160 km/h passenger, 80 km/h freight, operations from 2027
  • Media reports: The Star, Bernama, Sinar Harian, Utusan Malaysia, Free Malaysia Today, Harian Metro
  • Distances and driving times are estimates based on station coordinates and public road route data

Disclaimer: This page is an independent information guide for travel planning purposes and is not an official ECRL website. For official information, please refer to ecrl.com.my and mrl.com.my. All dates, distances and statuses are subject to change.